Project Description

Location: Kaohsiung, Taiwan

HHT was contracted to supply a 45,000 MTPY EOD plant based on the world-renowned HH Loop Reactor Technology. Over the course of this project, HHT’s duties and obligations included:

  • Supplying the basic engineering for the EO storage, refrigeration, scrubber, and safety system.
  • HHT Loop Reactor.
  • Heat Recovery System integration with CMFC’s cogen plant.
  • Supply of critical and long lead equipment.
  • Detailed design reviews.
  • Support for construction, commissioning, and start-up.